Blackout Sizer Calculator
EN

EV charging Level 2, 48 A: how much battery you need

EV charging Level 2, 48 A draws about 11500 W (11500 W range), runs 100% of the time and uses 46000 Wh per day. Start-up surge: 11500 W.

ChargePoint Home Flex at 48 A delivers 11,500 W. On backup, set the charger to its lowest current.

Battery needed

HoursWhBattery (Wh)Inverter (W)
For 8 hours153332323312651 / 11500
For 24 hours460006969712651 / 11500
For 72 hours13800020909112651 / 11500

Open in calculator with this appliance →

Stations that fit (24 h)

Bluetti Elite 10
128 Wh · 200 W (200 W peak)
→

Shop links are affiliate links: if you buy, we earn a small commission at no cost to you. Picks are based on your numbers, not on commission.

FAQ

How many watts does a EV charging Level 2, 48 A use?

Typically 11500 W while running, with a range of 11500 W depending on model and age. Start-up surge can reach 11500 W.

How long will a 1000 Wh power station run a EV charging Level 2, 48 A?

About 0.1 hours on the clock, allowing for the 100% duty cycle, inverter losses and a 20% reserve.

What size power station do I need for a EV charging Level 2, 48 A overnight (8 h)?

About 23233 Wh of battery and an inverter rated at least 12651 W continuous with 11500 W surge.

Can I run a EV charging Level 2, 48 A on solar during an outage?

You need roughly 30667 W of panels in winter to replace a day's use (46000 Wh), charging through a station with a big enough MPPT input.

Other sizes

L1 12 A1440 W1L2 16 A3800 WL2 32 A7700 W

Other appliances

E-bike battery charge (500 Wh)120 W

1 Approximate values: estimated from motor or heater power and typical figures published online, not from a manufacturer chart. Check your appliance label.

Inverter efficiency 88%, usable depth of discharge 90%, reserve 20%. Full method: How we calculate. source